Sök:

Sökresultat:

111 Uppsatser om Skoghall Mill - Sida 1 av 8

Service Level Management : Equalize unloadingencrustation at Stora Enso ? Skoghalls bruk

The report is part of the university´engineer program within Industrial Organization and Economics with specialization in Logistics and Managment at Jönköping´s university.Skoghall´s mill underlies a large supply chain, which means there should be a lot of areas in need of small improvement measures. This report illustrates a small part of one of these areas and is focused on the loading distribution services in the terminal Vänern.At the moment there´s a very unequal load of the load carriers SECU box and Container at the terminal. Skoghall´s mill has the desire to equalize the high and low load levels of the 2 loading carriers named previously. One of the options to solve the problem is to set a limit of how much the carriers can load per week or per day. The mill also wants it to be investigated if the proposition would influence the customers in any way and if both the company and its customers could handle a lower level of delivery services in case the proposition was to be applied.The goal to be achieved with this thesis is to provide balance to the unequall loading of the 2 load carriers, SECU and Container, and investigate whether or not the Skoghall´s mill´s customers, could manage the lower degree of delivery service that the proposition would imply.For this goal to be achieved, random sample investigations were taken from orders of a customer that is provided with SECU load carriers and the same was made with a Container´s customer.

Närsaltsdosering till luftad damm : en åtgärd för ökad TOC-reduktion hos Skoghalls Bruk luftade damm

In the process of making carton boards into Skoghall Mill, are great quantities of water being contaminated. This water has to be treated before it is possible to release into the recipient, Kattfjorden. One of the contaminations that is important to extract from the wastewater, is organic carbon (measured as TOC-total organic carbon) because microbiological breakdown can lead to the bottom becomig free of oxygen.The wastewater treatment at Skoghall Mill is done through an external wastewater treatment that is located at the factory. The biological treatment (aerated lagoon) is a 140 000 m3 water pool with surface aerator, which is give oxygen to the water. In the lagoon live microorganisms who performs the biggest part of the TOC-reduction.One problem with the lagoon is that the treatment of TOC is considerably worse during wintertime than during summertime.

Hantering och lagerföring av reservdelar vid Stora Enso Skoghall

Denna uppsats utreder problematiken rörande hantering och lagring av reservdelar vid Stora Enso Skoghall. Reservdelar följer sällan ett givet efterfrågemönster vilket gör det svårt att använda klassiska ordermodeller som exempelvis EOQ. Den teoretiska referensramen går igenom de klassiska modellerna samt några modeller anpassade för reservdelshantering. Vår undersökning riktar dels in sig på processer och handlingsförfaranden hos Skoghall samt några artiklar ur olika kategorier för att verklighetsanknyta modellerna. De slutsatser som vi dragit från vår undersökning är att det inte finns någon universalmodell som på ett enkelt sätt löser reservdelsproblematiken.

Råvaruinflöde inom träindustrin : En fallstudie på ett norrländskt pappersbruk

Today's global market means that raw materials are sought and bought from all over the world. This creates an higher demand for a well-functioning supply chain. In our thesis we have studied a large paper mill in northen Sweden which experiences issues with flow of raw material. Our aim has hence been to examine which aspects affect the flow of raw materials to the mill, and how these can be adressed using an IT-system. The question we sought to answer was; What factors are important to consider and how do these affect the ability of an IT-system which will support the flow of raw material at the paper mill? We have found that the problems are strongly connected to the low amount of information sharing between the mill and the suppliers.

Vindpark Vänern : Fundamentteknik och Logistik

An analysis of a specific application of anaerobic wastewater treatment at a pulp and board mill, Stora Enso Skoghall, was carried out. A literature study was done and effluent wastewater from CTMP pulp production was analyzed. The analysis consisted of a broad constituent analysis and an anaerobic treatment trial. Results from these test where used to calculate the treatment effectiveness and resulting energy potential at the mill.The literature study and constituent analysis showed that toxicity of the water to be treated, due to wood extractives and sulphur content, was of concern. Detoxification chemicals targeting these constituents where used in the anaerobic treatment trial.

Anaerob rening vid StoraEnso Skoghalls Bruk

An analysis of a specific application of anaerobic wastewater treatment at a pulp and board mill, Stora Enso Skoghall, was carried out. A literature study was done and effluent wastewater from CTMP pulp production was analyzed. The analysis consisted of a broad constituent analysis and an anaerobic treatment trial. Results from these test where used to calculate the treatment effectiveness and resulting energy potential at the mill.The literature study and constituent analysis showed that toxicity of the water to be treated, due to wood extractives and sulphur content, was of concern. Detoxification chemicals targeting these constituents where used in the anaerobic treatment trial.

Valsningsteknik för extremt höghållfasta tunna stål

New high strength steels require improved cold rolling techniques. The aim of this degree project was to develop a new and money saving cold rolling technique to manufacture steel strip for saw blades. The work is based on earlier rolling experiments made with a high carbon steel grade at LuCoil Steel AB. The work also focused on the mill requirements to cold roll high strength steels. The results show that LuCoil?s existing cold rolling mill was actually designed for rolling low carbon steel.

Att tala om Leviathan : Yttrandefrihet i konflikt med statens behov av skydd ? En fallstudie av åtalet mot Bradley E. Manning

This paper is a case study on Bradley E. Manning, famous for leaking classified intelligence to media, or in the charge sheet?s words: ?knowingly give intelligence to the enemy, through indirect means.? My opinion is that this sort of dilemma is a question of values, how you view the world and, most important of all, human rights and the philosophy of rights. Therefore I decided to sort out the arguments regarding the issue of freedom of speech versus the state?s need for protection.

Tidsåtgång för rundvirkesmottagning på Södra Cell Mörrum

This study was made for the round wood transport company MT Transport AB. Time studies were made in order to analyze time consumption on the mill site for timber trucks delivering round wood at the Södra Cell Mörrum mill. The most interesting was to see how much of the time spent at the factory that was waiting time. In three weeks the study was going on and the drivers were clocking it themselves..

Biologisk reducering av nitrat och nitrit i vatten

During the summer 2007 was a scrubber tested at Gruvön papper mill in Grums. The scrubber reduced NOx with 90 % in flue gas. NOx was transferred from the flue gas to a scrubber liquid as nitrate and nitrite. The scrubber liquid needs to be purified from nitrate and nitrite. One possible solution is to clean the scrubber liquid in Gruvön biologic cleaning construction.Microorganisms in the biologic cleaning construction need to assimilate nitrogen. There are environments free from oxygen in the cleaning construction.

Effekt på värdeutfallet av sågad vara vid övergång från 30 till 60 cm moduler : - en fallstudie av Moelven

The purpose of this study is to explain how the value of sawn wood changes when sawn wood are cut in 30 respective 60 cm lengths. The raw material into the saw mill will mainly be bucked in 30cm and 60 cm modules. There will also be two alternatives where the timber will be bucked special lengths, 370, 490 and 550 cm but also in 490 and 550 cm.The method used for the study is to simulate both cutting and sawing the woods. For cutting the simulator Timan is used and for sawing the simulator Timberopt is used. When data is generatedfrom the simulators, calculations of some key figures is done and also how much the revenue need to be increased for the sawn wood in order to cover for the increased costs of changing sawn woodfrom 30 cm to 60 cm modulesThe conclusion is that the single biggest reason, impacting the value of the sawn wood is the cutting at the saw mill.When going from 30 to 60 cm modules, the impact will be that the customers to the saw mill must pay more to increase the revenue by at least 10% for the sawn wood in order to justifice the changein production.It is also possible to increase the value of the products further by bucking the timber in three lengths, 370, 490 and 550 cm, in order to get 12 % increase of the share of longer sawn wood (>= 480 cm)..

THE ROLE OF MERCHANDISER IN MANAGING THE SUPPLY CHAIN

This research project is based on observing and Analyzing the Role of a textile merchandiser in managing the supply chain of the Home Textiles In The Buying or retailing, in the Mill and with the Agents. The project also "highlights the comparative analysis of the practices by Followed merchandisers into the retailer side, mills and Those In The Agents', on the basis of the Functions Which Supports the supply chain. In the discussion, We Have highlighted Importance Of The Role Played by an agent and by the merchandisers of Buyer and Supplier in Different situation. By our research work we find out The Challenges face by merchandisers And Then we come up with sometime suggestions.This Research Project Has Been Developed by Contacting and Visiting Hemtex, Brink Textiles, by interviewing the merchandisers working in the Industries like Al-Abid Silk Mill . By Analyzing the data & the data through the visits and the interviews, this Research Project Has Been Combined to give in-depth knowledge about the Activities Which merchandisers performer in a mill and into buying a house..

Användning av CAD-data vid NC-programmering

The degree project is performed at Metso Kamfab. The production is aimed on machines everything from handling of fiber to paper pulp. Metso Fiber and Kamfab are using Pro/Engineer for design and blueprint production. The processing department types the NC-programs in notepad on the basis of the blueprints, the CAD-dates that already is there are not used. The aim with the work is to study if Kamfab can use CAM-system for processing and production of programs for their NC-machines.

Flaskhalshantering genom materialstyrning : En fallstudie på LB-Hus

Title: Bottleneck management through materials administration Course:  4FE05EAuthors:  Mikael Karlsson and Johannes Mueller  Examiner: Helena ForslundKey words:  Bottleneck management, material management, process description, timber, proceduresPurpose:   The objective of this study is divided into three parts, all three parts of the purpose aim for the same goal. Namely, to improve the material management so that this enables the bottleneck in the planing mill to keep a continuous  flow, and thereby minimizing the risk for production stops at LB-Hus.  Part.  1:  Identify  and  analyze the material management  connected to  the planing mill  in order to identify problem areas.Part.2:  Identify  improvement potential  in the material management connected to the planing mill.  Part.3: Suggest improvements in the material management connected to the planing mill. Theoretical framework: Process mapping, inventory accounting, balance safety, inventory availability / service levels, safety stock and reorder point, forecasting and routine descriptions.Empirical foundation:  Interviews carried out at LB-House,  illustrated with the help of process maps and a description of each process.  Conclusions:  To work with  the  suggestions  given  and  to  follow  clear procedures  in  all  processes would  result in  a more  efficient  inventory management,  it would also present  a  solution  to  the problem regarding the planing mill being a bottle neck.Suggestions for further research: Review and map the information flow from demand to production start.

Färsk ved till Hallstaviks pappersbruk :

Hallstaviks papermill is an industry plant within Holmen Paper. Hallstavik is a mechanical mill and produce newspaper and journal paper. During year 2000, Hallstavik used approximate 1.200 m3f spruce, either as logs or chips from sawmills. Due to that the production is running continuously the mill also needs raw material at the same rate. At some periods the supply of raw material cannot keep up pace.

1 Nästa sida ->